
Digging for the house pad is pretty much complete. Next week the trenches for the footings and stem walls will be dug, along with the utility trenches. Being on the lot and seeing the 9 foot cliffs is very intimidating, since we know how much work is ahead for us, and that there is no turning back now!
The boys enjoyed standing at the top of the excavated walls on Friday and throwing rocks into the "pit." I told them it was less than efficient to do that, but they ignored me! Every time I try and pull them away from the lot, they get cranky on me...so at least we know they enjoy being there.





0 comments:
Post a Comment