Wednesday, April 11, 2007

Excavation: All in a Day's Work

We replaced our excavation subs with somebody past the 1st grade. A lot was done in less than a day, even to the point of digging for some of the retaining walls.

The corner that I was concerned about being too low before ended up what I thought. They are going to build it up some to be the correct elevation, but the only concern is that the cost of concrete for the stem walls in that one area will be a little more than we anticipated since it has to extend down to natural grade.

These images are in order from this morning to this afternoon:




0 comments: